Yılmaz Defense Industry

AKT 05

/

Drying Furnace

This furnace will partially remove the moisture contained in the primer cup whose chemical dosage has been completed by using a chained conveyor system. The tunnel using a chained conveyor system, will be used to partially remove the moisture contained in the primer cup whose chemical dosage has been completed.
Infrared resistances will be used as the heating system.
Additionally, a second tunnel will be used for partial drying after the papering and varnishing processes.

MACHINE LAYOUT PLAN

TECHNICAL SPECIFICATIONS

Product

Primer

Capacity

300.000 pcs / min.

Avg. Electricty Consumption

8 kW

Electric Power

10 kW

Noise Level

85 decibels maximum (ISO EN 11688-1)

Output Product Formats

5,56 - 7,62 - 9 mm Primer

Facility Field Conditions

Dust-free environment and Maximum 40% Relative Humidity at 20-26 °C

Control Panel

Siemens HMI

Labor Requirement

1 Operator / Shift

Pneumatic Material

Festo, SMC Or Equivalent Quality

Feeding System

With Operator

Control Unit

Siemens PLC